© All rights reserved. NepalKhabar

Business

Power generation in Mid Marsyangdi down

Nepalkhabar

Nepalkhabar

 |  Lamjung

The Mid Marsyangdi Hydropower's energy production has declined with the receding water level in the Marsyangdi River.

The hydropower with the capacity of generating 70 MW electricity is now producing the 48MW electricity a day.

Hydropower's Chief Pavan Basnet said, "Until a month ago, water used to overflow, but it has declined now, thereby, reducing energy production. The declining trend will continue for two more months."

The power generation may decline as low as 26 MW. There are two turbines each with the capacity to run 35 MW electricity.

The construction of the hydropower had begun in 2000 and completed in 2008. It was constructed at the cost of Rs 27.20 billion.

In addition to this hydropower, other hydropowers are also witnessing decline in the power production.



Comments

Related News

ADB President Kanda pledges $2.4 billion support to back PM Shah’s reform vision for Nepal

The Asian Development Bank (ADB) has announced a monumental $2.4 billion financial package through …

PM Shah and visiting ADB President Kanda hold one-on-one meeting

Prime Minister Balendra Shah and Asian Development Bank (ADB) President Masato Kanda have held a on…

Nepal, ADB seal Rs 25 bln concessional loan deal for water and customs upgrades

The Nepal government and the Asian Development Bank (ADB) have signed a concessional loan agre…

Fly Dubai reps, Pokhara-based tourism community discuss ways for sustainability of Pokhara-Dubai service

Representatives of Fly Dubai and Pokhara-based tourism entrepreneurs met on Sunday to explore measu…
Copyright © 2021 Nepalkhabar. All Rights Reserved. Designed by Curves n' Colors. Powered by .