© All rights reserved. NepalKhabar

Society

BP Highway resumes; two-way traffic comes into operation

Nepalkhabar

Nepalkhabar

 |  Kathmandu

BP Highway which remained blocked for more than eight hours has resumed following the removal of the debris brought by the landslide.

The road has now come into operation two way after debris was removed, DSP Min Bahadur Ghale of District Police Office, Kavre told Nepalkhabar.

The road was blocked after the floods in the Roshi River washed away the diversion at Mamti in Roshi Rural Municipality at 9 PM yesterday.

A temporary diversion had been constructed after the flood washed away the road in the Nepali month Ashoj last year.



Comments

Related News

Another man attempts self-immolation in Kathmandu after Ganesh, undergoes treatment at Bir Hospital

A 45-year-old man set himself on fire inside his home in Buddhanagar, Kathmandu, early Saturday mor…

Heavy rainfall likely in a few hilly areas of Koshi, Bagmati, Gandaki, and Karnali

 Currently, the country is under the of monsoon winds. The low-pressure line of monsoon is loc…

Nepal committed to One China Policy: Foreign Ministry

The Nepal government has made it clear that Nepal is committed to the One China Policy. In a pre…

Protesters, MPs demand PM Shah’s resignation over Ganesh Neapali's death

Pressure is mounting on Prime Minister Balendra (Balen) Shah to step down following the tragic deat…
Copyright © 2021 Nepalkhabar. All Rights Reserved. Designed by Curves n' Colors. Powered by .