Shares
The Muglin-Narayangadh road section, which was blocked throughout the day today due to a landslide, has resumed operation.
According to the Bharatpur Road Division Office, the road has opened for two-way traffic after the landslide, which occurred near the Tuin Rivulet bridge, was removed at 6 pm.
The road had been closed on both sides since 12 noon due to the landslide.
Due to frequent landslides occurring on this road section, traffic has not been able to operate regularly for the past week.
Shares
.