© All rights reserved. NepalKhabar

Society

Koshi Highway resumes after two days

Nepalkhabar

Nepalkhabar

 |  Kathmandu

(File Photo)

The Koshi Highway obstructed by the dry landslide has resumed after two days.

The highway was blocked in the section of Khandbari-Kimathanka in the district, according to chief engineer at North-South Road Office, Sabin Koirala.

Huge stones fallen onto the road blocked the traffic, thereby causing sheer inconvenience to the people from northern belt, Bhotkhola. The road is linked to Changa and Denda of Tibet.

Similarly, many vehicles to and from Bhotkhola were stranded along the way.

Even an excavator operator was injured while clearing the obstruction on Sunday morning.



Comments

Related News

Nepal and WFP showcase school meals as pathway to sustainable dev

The Government of Nepal and the United Nations World Food Program (WFP) today launched two reports …

Medical doctors resign en mass at Narayani Hospital

All the medical persons of Narayani Hospital in Birgunj have resigned en masse. The doctors have…

Father, daughter killed in landslide

A father and his daughter were killed in a landslide at Bhatbeshi of Madhya Nepal Municipality-7 in…

Female teacher found dead in Jhapa school hostel; husband absconding

A 29-year-old female teacher was found dead under suspicious circumstances inside the hostel of Aru…
Copyright © 2021 Nepalkhabar. All Rights Reserved. Designed by Curves n' Colors. Powered by .